• ABAP Snippets
  • Top SAP Courses
  • Top SAP Books

SAP and ABAP Free Tutorials

Account assignment in SAP Purchasing (MM) – FAQ

SAP Purchase Order ME21N Exit e1472546229483

This note provides answers to frequently asked questions regarding account assignment in purchasing documents. This post is based on Snote 496082.

Table of Contents

FAQ: Account Assignement in SAP Purchasing

Account assignement : g/l account for a sales order.

Question: Why is the G/L account for a sales order with nonvaluated individual sales order stock different from the account with valuated indivi dual sales order stock?

Answer: See Note 458270.

Multiple Account Assignment in Purchasing

Question: Can you create several assets at the same time in the new purchasing transactions?

Answer: You can create several assets at the same time. However, you must first ensure that at least as many account assignment lines have bee n created as the number of assets that you want to create. You can do this very easily using the copy function.

G/L Account is not saved if switch to a material group

Question: You create a purchase order with account assignment using transaction ME22. You enter a material group, from which a G/L account is de termined using the valuation class. If you then switch to a material group that does not determine a G/L account via the valuation class, the system deletes the previous G/L account and prompts you to enter a G/L account. If you cancel the account assignment screen and change the material group back on the item detail screen, the previously determined G/L account is not determined again. Why is this ?

Answer: Unfortunately, this system behavior cannot be changed. First, enter any G/L account, so that the item is valid. If you then switch to the old material group again, the system also determines the correct G/L account again.

Entering the same account assignments for different items

Question: Is there an easy way of entering the same account assignments for different items in the new EnjoySAP transactions?

Answer: Ensure that Note 315676 has been implemented in your system and follow the procedure described there

Repeat account assignment function not work in the new EnjoySAP

Question: Why does the repeat acc. assignment function not work in the new EnjoySAP transactions when you create new account assignments in multiple acc. assign. ?

Solution: Use the copy function in multiple acc. assignment to create identical account assignment lines. You can use the repeat account assi gnment function to create similar account assignments for different items with the same account assignment category. To do this, proce ed as described in the answer to question 4.

Issue message KI 161 “Cost center &/& does n ot exist on &

Question: When you change the account assignment of an existing purchase order, why does the system issue message KI 161 “Cost center &/& does n ot exist on &” ? The same phenomenon occurs for other account assignment objects (for example, profit center).

Solution: Refer to Note 193371.

Can you create assets from the single account assignment screen?

Solution: Assets can only be created from the multiple account assignment screen (“Account assignment” tab). You can switch between single account assignment and multiple account assignment on the “Account assignment” tab page by clicking the icon above on the left.

Why does the system not display an account assignment tab page even though you have entered an account assignment category?

Solution: After you have implemented Note 520149, the account assignment tab is not displayed until all the required information is available, for example, the company code.

Why are account assignment objects derived in some situations, even though the relevant field on the account assignment tab page is hidden?

Solution: Refer to Note 619203.

ME 453 “Changing consump. or spec. stock indicator not allowed

You create a purchase order with reference to a subcontracting purchase requisition. This purchase requisition was created with an unknown account assignment, that is, account assignment category “U”. When you change the account assignment category in the purchase order, the system issues error message ME 453 “Changing consump. or spec. stock indicator not allowed (subcontracting)”.

Solution: See Note 205597

Select a valuated goods receipt together with multiple account assignment

Why can you not select a valuated goods receipt together with multiple account assignment in a purchase order or purchase requisition?

Solution: See Note 204252.

EBAN-FISTL, -GEBER, -KBLNR, -GRANT and -FKBER (as in table EKPO) empty

Funds Management is active. Why are the fields EBAN-FISTL, -GEBER, -KBLNR, -GRANT and -FKBER (as in table EKPO) empty? Solution: These fields are only filled if the account assignment category is set to “blank”. If you maintain an account assignment category in t he purchasing document, the system adds the information from these fields to the EBKN table (as in EKKN).

AA 334 “You cannot post to this asset (Asset & & blocked for acquisitions)

You try to change a purchase order item with acc. assignment category “A”, which contains a locked asset. The system issues error message AA 334 “You cannot post to this asset (Asset & & blocked for acquisitions)”. Solution: This is the standard system design. To make changes to this purchase order item, you have the following two options:

a) If you no longer require the purchase order item with the blocked asset, delete the purchase order item. b) Otherwise, you must activate the asset, make the required changes to the purchase order item, and then block the asset again.

The indicator for the account assignment screen

Question: What is the meaning of the indicator for the account assign. screen that you can set in Customizing for single account assignment/m ultiple account assignment? Solution: The indicator determines which account assignment screen is used by default for maintaining the account assign. for a purchase orde r item. For the EnjoySAP transactions, this value is simply a proposal that you can change in the purchasing document. For the old transactions, this value is the only one that you can use.

Question: Is there an unknown account assign. for standard purchase orders?

Solution: This is generally not allowed, and the system issues message ME 069 “Unknown account assignment not defined for use here”. There is an exception in the case of service items that are created with item category D (service) or B (limit).

Acc. Assignment check is not performed when Purchase Order is updated

Question: You change data in a purchase order item (for example, purchase order value, delivery date, and so on). Why does the system not perform another acc. assignment check?

Solution: This is the standard system design. When you created the purchase order item, if the system already checked the acc. assignment and there were no errors, another acc.?assignment check only takes place if you change a field that is relevant to account assign.?(for example, quantity, material number, and so on). If this system response does not meet your requirements, implement the account assignment check in the BAdI ME_PROCESS_PO_CUST. The BA dI is called each time the purchase order is changed.

“In case of account assignment, please enter acc. assignment data for item”

Question: If you delete all the account assign?lines that were entered in the account assignment screen, the system exits the account assign. tab page and goes to the material data. In addition, the system issues the error message “In case of account assignment, please enter acc. assignment data for item”.

Answer: In the current system design, if you delete all the account assignment lines, the system assumes that you do not want to maintain any account assignment data. This conflicts with the account assignment category and the system issues error message 06 436. You can then remove the account assignment indicator. Procedure: If you want to delete all the account assignment data that was entered, see the answer to question 24.

Third-party order processing (CS) and individual purchase order processing (CB)

Question: Which account assignment categories should you enter in schedule line categories for third-party order processing (CS) and individual purchase order processing (CB)? Solution: See Note 210997.

G/L Account is not transfered from Valuation class

Question: In a blanket purchase order or blanket purchase requisition with account assignment, you subsequently change the material group. Even though the new material group is assigned to another G/L account via the valuation class, the system does not redetermine the account assignment for the relevant item. The old G/L account remains.

Solution: See Note 449216.

Customizing Account assignment fields as required entry, optional entry, or display fields

Question: In Customizing, you can set the, or as completely hidden fields, depending on the account assignment category. These settings also determine whether the system deletes or retains the values for the account assignment fields when you change the account assignment category in a purchase order item.

Answer: In Customizing for materials management (MM), when you maintain account assignment categories (IMG: Materials Management-> Purchasing -> Account Assignment-> Maintain Account Assignment Categories), you can control the different account assignment fields as follows: Required entry: You must make an entry in the field, otherwise the system issues error message ME 083.

  • Optional entry: Entry in this field is optional.
  • Display: The field is displayed, but it is not ready for input.
  • Hidden: The field is hidden. Example:

The acc. assignment category is K, the cost center is an optional entry field and it is filled with the value 1000. You change the acc. assignment category to P. Subject to the field settings for the cost center for the acc. assignment category P, the system response is as follows: The cost center is a required entry or an optional entry field: The system transfers the value 1000 for the cos t center.The cost center is a display field: First, the value 1000 for the cost center is deleted. If the system can determine a value again after you enter the changed acc. assignment category, this value is transferred. The cost center is a hidden field: The system deletes the value 1000 for the cost center.

System ignores the acc. assignment data of the purchase requisition for the second schedule line.

Question: You create a purchase order item assigned to an account with reference to a purchase requisition. For this purchase order item, you create a second schedule line with reference to another purchase requisition. The system ignores the acc. assignment data of the purchase requisition for the second schedule line. Solution: This is the standard system design. The system does not generate multiple acc. assignment in the purchase order item, even if the t wo referenced purchase requisitions are assigned to different CO objects. Refer to Note 47150 for the old transactions and to Notes 422609 and 771045 for the EnjoySAP transactions.

Undelete an item in a purchase requisition if assignment data is no longer valid

Question: Why can you undelete an item in a purchase requisition if the corresponding acc. assignment data is no longer valid? Solution: When you undelete an item in a purchase requisition, the system does not perform a new acc. assignment check. Therefore, the accoun t assignment data is not checked again. Nevertheless, errors occur if you try to create a purchase order with reference to this purchase requisition. When you undelete an item in a purchase order, however, the system does perform another acc. assignment check.

Transfer of Acc. Assign. with Reference Document

Question: You create a purchasing document with reference to a reference document. What account assig. data is transferred? Solution: The acc. assignment data is derived from the reference document. If you delete the acc.?assignment category and enter it again, a new automatic general ledger account determination takes place.

Question What is the correct procedure for changing acc. assignment data?

– If, for example, you want to change the acc. assignment category: Note that you MUST first delete all existing acc. assignment data for the relevant item. You can do this by initializing (deleting) the acc. assignment category and confirming by choosing ENTER. Following this, you can enter the new acc. assignment category and the relevant acc. assignment data.

– If you want to change acc. assignment data for the relevant item: For example, you want to change the main acc. assignment objects such as cost center, G/L account, sales order, network, or WBS ele ment, and so on. Here also, we recommend deleting all existing acc. assignment data by initializing (deleting) the account assignme nt category and confirming by choosing ENTER.If you are working with contracts, you must delete the acc. assignment line on the acc. assignment screen and enter a new line t o ensure that the data is derived correctly again. You MUST NOT change the current settings. For example, in some circumstances, the requirements type (OVZH) or the valuation of the requirements class (OVZG) is changed after th e purchasing document is created. This can cause errors in a valuation of goods movements (goods receipt, for example) and MUST BE AVOIDED.

Read more on? Account Assignment

Related Posts

SAP Payment Terms Table

The Most Important SAP Payment Terms Tables (ZTERM, Text…)

October 21, 2018 March 24, 2021

SAP Batch Management 1

SAP Batch Management: User-exits and BAdIs

June 17, 2017 January 21, 2022

SAP Batch Management Tcodes, Tables and Customizing (SAP Batch Management)

June 16, 2017 January 21, 2022

Meet Gavern - Free Joomla! 3.0 Template

  • ERPCorp FI/CO Books
  • SAP Webinars
  • Client Roster
  • BECOME A MEMBER

Member section cover

ERPCorp SAP FICO Blog

Display sap mm-fi automatic account assignment.

SAP Press Salehttps://shrsl.com/43z0d

by John Jordan

JJ new

Table of Contents

Introduction, display obyc accounts with se16n, more information.

You use configuration Transaction OBYC to assign SAP General Ledger (GL) accounts in Financial Accounting (FI) to movement types in Materials Management (MM), also known as SAP MM-FI Automatic Account Determination or Assignment.

End users do not typically have the authorization to run configuration Transaction OBYC. 

You can easily display automatic account assignments as follows:

View table T030, which stores OBYC configuration settings, with Transaction SE16N.

Type in Table T030 and press Enter to display the selection screen shown in Figure 1.

41 001

Figure 1 : Table T030 Selection Screen To Display SAP MM-FI Configuration Settings

You restrict the table entries displayed on the subsequent results screen by making entries in the Selection Criteria section. To display G/L accounts posted during goods issues (GI) to production orders, make the following entries:

  • Chart of Accounts : Restrict your selection by your chart of accounts, INT in this example
  • Transaction : You display inventory movements with Transaction  GBB
  • Valuation Grouping Code : A group of company codes (set up with transaction OMWD)
  • Account modifier : VBR for GI to production orders
  • Valuation Class : You assign a valuation class in the Costing 2 view 

Click the execute icon to display the screen shown in Figure 2.

41 002

Figure 2 : Table T030 Entries Display SAP MM-FI Configuration Settings

This screen displays the G/L Accounts posted during goods issues to production orders.

For more information on entries in table T030, follow IMG menu path: 

Materials Management • Valuation and Account Assignment • Account Determination • Account Determination Without Wizard • Configure Automatic Postings

Figure 3 displays the menu path.

41 003

Figure 3 : Configure Automatic Postings Menu Path

Click the paper and glasses icon to the left of Configure Automatic Postings at the bottom to display standard SAP documentation on setting up automatic postings.

  

Activity Type

An activity type identifies activities provided by a cost center to manufacturing orders. The secondary cost element associated with an activity type identifies the activity costs on cost center and detailed reports

Alternative Hierarchy

While there can only be one cost center standard hierarchy, you can create as many alternative hierarchies as you like. You create an alternative hierarchy by creating cost center groups

Automatic Account Assignment

Automatic account assignment allows you to enter a default cost center per cost element within a plant with Transaction OKB9.

Condition Type

A condition type is a key that identifies a condition. The condition type indicates, for example, whether the system applies a price, a discount, a surcharge, or some other pricing, such as freight costs and sales taxes.

Cost Center Accounting

A cost center is a function within an organization that does not directly add to profit but still costs money to operate, such as the accounting, HR, or IT departments. The main use of a cost center is to track actual expenses for comparison to the budget.

Cost Estimate

A cost estimate calculates the plan cost to manufacture a product or purchase a component. It determines material costs by multiplying BOM quantities by the standard price, labor costs by multiplying operation standard quantities by plan activity price, and overhead values by costing sheet configuration.

Cost Object

An SAP Cost object such as a cost center or internal order describes where the cost occurs. A cost element or account describes what the cost is.

Costing Lot Size

The costing lot size in the Costing 1 view determines the quantity cost estimate calculations are based on. The costing lot size should be set as close as possible to actual purchase and production quantities to reduce lot size variance.

Goods Issue

A goods issue is the movement (removal) of goods or materials from inventory to manufacturing or to a customer. When goods are issued, it reduces the number of stock in the warehouse.

Goods Receipt

It is a goods movement that is used to post goods received from external vendors or from in-plant production. All goods receipts result in an increase of stock in the warehouse.

Internal Order

An internal order monitors costs and revenue of an organization for short- to medium-term jobs. You can carry out planning at a cost element and detailed level, and you can carry out budgeting at an overall level with availability control.

Production Variance

Production variance is a type of variance calculation based on the difference between net actual costs debited to the order and target costs based on the preliminary cost estimate and quantity delivered to inventory. You calculate production variance with target cost version 1.

Profit Center

A profit center receives postings made in parallel to cost centers and other master data such as orders. Profit Center Accounting (PCA) is a separate ledger that enables reporting from a profit center point of view. You normally create profit centers based on areas in a company that generate revenue and have a responsible manager assigned.

If PCA is active, you will receive a warning message if you do not specify a profit center, and all unassigned postings are made to a dummy profit center. You activate profit center accounting with configuration Transaction OKKP, which maintains the controlling area.

Purchasing Info Record

A purchasing info record stores all of the information relevant to the procurement of a material from a vendor. It contains the Purchase Price field, which the standard cost estimate searches for when determining the purchase price.

Scheduling Agreement

A scheduling agreement is a longer-term purchase arrangement with a vendor covering the supply of materials according to predetermined conditions. These apply for a predefined period and a total purchase quantity.

Standard Hierarchy

A standard hierarchy represents your company structure. A standard hierarchy is guaranteed to contain all cost centers or profit centers because a mandatory field in cost and profit center master data is a standard hierarchy node.

To learn more about MM-FI, and SAP S/4HANA FICO topics  become a member  Click here now :

erp book 2

Standard Price

The standard price in the Costing 2 view determines the inventory valuation price if price control is set at standard (S). The standard price is updated when a standard cost estimate is released. You normally value manufactured goods at the standard price.

You can apply surcharges to material prices and activity prices in order to take into account increases or decreases in item prices over time when calculating the lifecycle costs for a project.

Target Costs

Target costs are plan costs adjusted by the delivered quantity. For example, if the quantity delivered to inventory is 50% of the plan quantity, target costs are calculated as 50% of the plan costs.

Material Master

A material master contains all of the information required to manage a material. Information is stored in views, and each view corresponds to a department or area of business responsibility. Views conveniently group information together for users in different departments, for example, sales and purchasing.

Origin Group

An origin group separately identifies materials assigned to the same cost element, allowing them to be assigned to separate cost components. The origin group can also determine the calculation base for overhead in costing sheets.

Price Control

The Price control field in the Costing 2 view determines whether inventory is valuated at standard or moving average price.

The price unit is the number of units to which the price refers. You can increase the accuracy of the price by increasing the price unit. To determine the unit price, divide the price by the price unit.

Process Order

Process orders are used for the production of materials or provide services in a certain quantity and on a certain date. They allow resource planning, process order management control, and account assignment and order settlement rules to be specified.

Procurement Alternative

A procurement alternative represents one of a number of different ways of procuring a material. You can control the level of detail in which the procurement alternatives are represented through the controlling level. Depending on the processing category, there are single-level and multilevel procurement alternatives. For example, a purchase order is single-level procurement, while production is multilevel procurement.

Production Order

A production order is used for discrete manufacturing. A BOM and routing are copied from master data to the order. A sequence of operations is supplied by the routing, which describes how to carry out work-steps. An operation can refer to a work center at which it is to be performed. An operation contains planned activities required to carry out the operation. Costs are based on the material components and activity price multiplied by a standard value.

Product Drilldown Reports

Product drilldown reports allow you to slice and dice data based on characteristics such as product group, material, plant, cost component, and period. Product drilldown reports are based on predefined summarization levels and are relatively simple to setup and run.

Production variance is a type of variance calculation based on the difference between net actual costs debited to the order and target costs based on the preliminary cost estimate and quantity delivered to inventory. You calculate production variance with target cost version 1. Production variances are for information only and are not relevant for settlement.

Production Version

A production version determines which alternative BOM is used together with which task list/master recipe to produce a material or create a master production schedule. For one material, you can have several production versions for various validity periods and lot-size ranges.

Purchase Price Variance

When raw materials are valued at the standard price, a purchase price variance will post during goods receipt if the goods receipt or invoice price is different from the material standard price.

Profitability Analysis

Costing-based profitability analysis enables you to evaluate market segments, which can be classified according to products, customers, orders (or any combination of these), or strategic business units, such as sales organizations or business areas concerning your company’s profit or contribution margin.

SAP Profit Center is a management-oriented organizational unit used for internal controlling purposes. Segmenting a company into profit centers allows us to analyze and delegate responsibility to decentralized units.

A purchasing info record stores all the information relevant to the procurement of a material from a vendor. It contains the Purchase Price field, which the standard cost estimate searches for when determining the purchase price.

Raw Materials

Raw materials are always procured externally and then processed. A material master record of this type contains purchasing data but not sales.

A routing is a list of tasks containing standard activity times required to perform operations to build an assembly. Routings, together with planned activity prices, provide cost estimates with the information necessary to calculate labor and activity costs of products.

Sales and Operations Planning

Sales and operations planning (SOP) allows you to enter a sales plan, convert it to a production plan, and transfer the plan to long-term planning.

S&OP is slowly being replaced by SAP Integrated Business Planning for Supply Chain (SAP IBP), which supports all S&OP features. S&OP is intended as a bridge or interim solution, which allows you a smooth transition from SAP ERP to on-premise SAP S/4HANA and SAP IBP. See SAP Note 2268064 for details.

SAP Fiori is a web-based interface that can be used in place of the SAP GUI. SAP Fiori apps access the Universal Journal directly, taking advantage of additional fields like the work center and operation for improved variance reporting.

Work in process (WIP) and variances are transferred to Financial Accounting, Profit Center Accounting (PCA), and Profitability Analysis (CO-PA) during settlement. Variance categories can also be transferred to value fields in CO-PA.

Settlement Profile

A settlement profile contains the parameters necessary to create a settlement rule for manufacturing orders and product cost collectors and is contained in the order type.

Settlement Rule

A settlement rule determines which portions of a sender’s costs are allocated to which receivers. A settlement rule is contained in a manufacturing order or product cost collector header data.

You need setup time to prepare equipment and machinery for the production of assemblies, and that preparation is generally the same regardless of the quantity produced. Setup time spread over a smaller production quantity increases the unit cost.

Simultaneous Costing

The process of recording actual costs for cost objects, such as manufacturing orders and product cost collectors in cost object controlling, is called simultaneous costing. Costs typically include goods issues, receipts to and from an order, activity confirmations, and external service costs.

Source Cost Element

Source cost elements identify costs that debit objects, such as manufacturing orders and product cost collectors.

Source List

A source list is a list of available sources of supply for a material, which indicates the periods during which procurement is possible. Usually, a source list is a list of quotations for a material from different vendors.

You can specify a preferred vendor by selecting a fixed source of supply indicator. If you do not select this indicator for any source, a cost estimate will choose the lowest cost source as the cost of the component. You can also indicate which sources are relevant to MRP.

The standard price in the Costing 2 view determines the inventory valuation price when price control is set at standard (S). The standard price is updated when a standard cost estimate is released. You normally value manufactured goods at the standard price.

Subcontracting

You supply component parts to an external vendor who manufactures the complete assembly. The vendor has previously supplied a quotation, which is entered in a purchasing info record with a category of subcontracting.

Tracing Factor

Tracing factors determine the cost portions received by each receiver from senders during periodic allocations, such as assessments and distributions.

Universal Journal

The efficiency and speed of the SAP HANA in-memory database allowed the introduction of the Universal Journal single line-item tables ACDOCA (actual) and ACDOCP (plan). The Universal Journal allows all postings from the previous financial and controlling components to be combined in single items. The many benefits include the development of real-time accounting. In this book, we discuss both period-end and event-based processing.

Valuation Class

The valuation class in the Costing 2 view determines which general ledger accounts are updated as a result of inventory movement or settlement.

Valuation Date

The valuation date determines which material and activity prices are selected when you create a cost estimate. Purchasing info records can contain different vendor-quoted prices for different dates. Different plan activity rates can be entered per fiscal period.

Valuation Grouping Code

The valuation grouping code allows you to assign the same general ledger account assignments across several plants with Transaction OMWD to minimize your work. The grouping code can represent one or a group of plants.

Valuation Type

You use valuation types in the split valuation process, which enables the same material in a plant to have different valuations based on criteria such as batch. You assign valuation types to each valuation category, which specify the individual characteristics that exist for that valuation category. For example, you can valuate stocks of a material produced in-house separately from stocks of the same material purchased externally from vendors. You then select procurement type as the valuation category and internal and external as the valuation types.

Valuation Variant

The valuation variant is a costing variant component that allows different search strategies for materials, activity types, subcontracting, and external processing. For example, the search strategy for purchased and raw materials typically searches first for a price from the purchasing info record.

Valuation Variant for Scrap and WIP

This valuation variant allows a choice of cost estimates to valuate scrap and WIP in a WIP at target scenario. If the structure of a routing is changed after a costing run, WIP can still be valued with the valuation variant for scrap and WIP resulting in a more accurate WIP valuation.

Valuation View

In the context of multiple valuation and transfer prices, you can define the following views: – Legal valuation view – Group valuation view – Profit center valuation view

Work Center

Operations are carried out at work centers representing; for example, machines, production lines, or employees. Work center master data contains a mandatory cost center field. A work center can only be linked to one cost center, while a cost center can be linked to many work centers.

Work in Process

Work in process (WIP) represents production costs of incomplete assemblies. For balance sheet accounts to accurately reflect company assets at period end, WIP costs are moved temporarily to WIP balance sheet and profit and loss accounts. WIP is canceled during period-end processing following delivery of assemblies to inventory.

Meet John Jordan, Kent Bettisworth, Gerald Steele and other SAP expert speakers in person at SAP Controlling Financials 2024 Conference in San Diego, CA

Use exclusive coupon code: jj100 for $100 off click here.

For the latest updates

About the author

account assignment sap

John Jordan

account assignment sap

Author's recent posts

account assignment sap

Captcha Image

account assignment sap

ERProof - Blog about All Things SAP

Blog about all things SAP

ERProof » SAP CO » SAP CO Training » SAP CO Account Assignment

SAP CO Account Assignment

SAP CO Account Assignment

Normally, when a financial document is entered in SAP FI module , user has the option of entering the cost center in the financial document. However, when documents are entered from different modules or a cross-module financial transaction occurs, such as from MM or SD , there is no option of entering the cost center in the document. In this situation, the SAP system will derive the cost center through automatic SAP CO account assignment, substitutions, or through default settings made in the primary cost element.

Automatic SAP CO Account Assignment

The automatic account assignment has to be configured in the transaction code OKB9 . For posting made in external accounting, such as for price differences, exchange rate differences, etc., the SAP system automatically checks entries in the OKB9 settings and derives the cost center.

If you do not enter a CO object (order, cost center, or project) in external accounting postings made in FI, MM or SD modules and the posting is cost relevant, then the automatic account assignment checks the relevant cost center and makes the posting.

Here are examples of automatic account assignments:

  • Banking fees, exchange rate differences and discounts in FI
  • Minor differences and price differences in MM

The account assignment objects that can be maintained in the transaction OKB9 are:

  • Cost center
  • Profit center (profitability segment)

Normally, the automatic account assignment runs on the company code level along with the CO object. However, if the user wants to make the posting on the business area level, valuation area level or profit center level, it is also available in OKB9 settings. So basically it includes the following levels:

  • Company code level
  • Business area level
  • Valuation area level
  • Profit center level

The above 3 excluding the company code level are used in cases when the account assignment is needed below the company code level.

Prerequisites

Here are the prerequisites of activating automatic SAP CO account assignment:

  • Activation of the cost center accounting
  • Creation of cost centers
  • Maintenance of cost elements

Additionally, you can also create orders and profit centers as per the business requirements.

Settings in Transaction OKB9

Let’s discuss settings that are possible for automatic SAP CO account assignment in OKB9 transaction.

Start SPRO transaction and navigate to the following path:

Controlling – Cost Center Accounting – Actual Postings – Manual Actual Postings – Edit Automatic Account Assignment (OKB9)

Alternatively, you can start OKB9 transaction directly from the command bar.

Transaction OKB9 – SAP CO Account Assignment

  • If you want to have the setting on the company code level only, then enter the company code and the cost element along with the corresponding CO object, i.e. a cost center, an order or a profit center.
  • If you want to have the settings on the valuation area level, then enter the company code and the cost element and chose the ‘valuation area’ option in the account assignment detail as ‘1’.
  • Similarly, if you want to have the settings on the business area or profit center level, then choose the option ‘2’ or ‘3’ respectively.

If you have chosen account assignment detail ‘1’ or ‘2’, then click on ‘Detail per business area/valuation area’ on the left sidebar.

Transaction OKB9 – Details per Business Area / Valuation Area

Default SAP CO Account Assignment

In order to determine the correct CO account assignment, the SAP system performs several checks in the following sequence. First it checks the document which a user is posting. If the cost center is empty in the document, then the system checks if any substitutions are maintained for the particular G/L account . Next, if the substitution is also missing, then the system moves on to the OKB9 settings for automatic SAP CO account assignments. Finally, if these settings are also missing, the SAP system checks master data of the primary cost element (G/L Account) under the tab of Default Account Assignment . You can display this master data using the transaction KA03 .

You can maintain the cost center and the order in the master data of the primary cost element.

SAP Cost Element Master Data

So, basically the order of checks the system makes is:

  • Financial document – Cost center
  • Substitutions – transaction OKC9
  • Automatic account assignments – transaction OKB9
  • Default account assignments – transaction KA03 / KA02

Lastly, if any of the above is not maintained, then the SAP system throws an error ‘Account X requires an assignment to a CO Object’ and doesn’t allow posting of a document.

SAP CO Account Assignment using Substitution

In cases where you don’t need OKB9 or default account assignment, the user can go for user exits where a specific G/L account is mentioned under the company and the value in the cost center is substituted by the cost center given in the substitution.

The transaction for maintaining the substitution is GGB1 .

SAP Create Substitution Transaction

Usage of substitutions for SAP CO account assignment is justified by the business requirement and usually SAP CO account assignment requirements are fulfilled by OKB9 or default account assignments.

Did you like this tutorial? Have any questions or comments? We would love to hear your feedback in the comments section below. It’d be a big help for us, and hopefully it’s something we can address for you in improvement of our free SAP CO tutorials.

Navigation Links

Go to next lesson:  SAP Adjustment Postings

Go to previous lesson:  SAP Profit Center

Go to overview of the course: Free SAP CO Training

4 thoughts on “SAP CO Account Assignment”

it is helpful material i ask for more clear details for using substitution method for Account Assignment. thanks in advance

Sir, I am not receiving the training mails from yesterday 7/1/2019. I have completed my training till here(SAP CO Account Assignment) please do send the rest of the training emails for SAP CO. Hope you will do the needful.

I am getting the same error “Account 500911 requires an assignment to a CO object”. In OKB9, we have given company code, Cost element and ticked the check box ‘Indicator: Find profitability segment using substitution’ (V_TKA3A-BSSUBST) and not filled anything like cost center, order and profit center. in OKC9 we have created substitution. All the process happening through Idoc Message Type SINGLESETTRQS_CREATE and inside BAPI BAPI_SINGLESETTREQS_CREATEMULT triggering and raising this error. Cost center is not maintained in 1. Financial document – Cost center 2. Automatic account assignments – transaction OKB9 and 3. Default account assignments – transaction KA03/KA02 But we have substitution in transaction OKC9 to determine cost centre.

Where woulbe be the issue?

good explanation

Leave a Reply Cancel reply

Do you have a question and want it to be answered ASAP? Post it on our FORUM here --> SAP FORUM !

Your email address will not be published. Required fields are marked *

Save my name, email, and website in this browser for the next time I comment.

Explaining the Utilization of Different Account Assignment Objects

After completing this lesson, you will be able to:

  • Explain the use of different account assignment objects

Account Assignment Objects

In the finance department, different entries may be required when entering documents. This depends, among other things, on the modules and functions that are required and set up for the specific company.

For example, if profit center reporting is required, this information must also be available at document level so that the corresponding evaluation can be created exactly and completely. This also applies to the use of segment reporting or the representation of simple projects. Some of the required information is automatically provided by the system. This is very helpful for the user and saves time.

Another example is the data required for controlling. Financial and management accounting work closely together in SAP. In G/L accounts that are to provide controlling-relevant information, the connection to controlling is made by choosing the G/L account type. If you post to an account that is of the type Primary Costs or Revenue, for example, you must enter a controlling element when posting.

If additional account assignment objects are entered by the employee, this can usually be done when you enter the line items.

account assignment sap

Account Assignments

In our next topic, we will discuss how to perform a manual posting of a G/L document.

Log in to track your progress & complete quizzes

Online Tutorials & Training Materials | STechies.com

What is Account assignment in SAP FICO ?

Updated Apr 01, 2023

Account assignment is a critical aspect of financial accounting and management in any organization. It refers to the process of allocating financial transactions to specific cost or profit centers, projects, or business processes. By properly assigning financial transactions to the appropriate account, organizations can accurately track their expenses, revenues, and profitability. This information can then be used to make informed decisions about resource allocation, cost control, and overall financial management. 

In SAP FICO, account assignment is a core module that offers various types of account assignment options, including cost center accounting, profit-center accounting, internal order accounting, and WBS element accounting. These options provide organizations with greater visibility into their financial performance, enabling them to optimize their operations and drive greater value for their stakeholders.

Types of  Account Assignment 

There are several types of account assignments in SAP FICO, including:

  • Cost center accounting 
  • Profit center accounting
  • Internal order accounting
  • WBS element accounting

i) Cost center accounting 

Cost center accounting is the process of tracking and analyzing costs associated with each department, function, or unit of an organization. SAP FICO provides a module that allows organizations to create and manage cost centers, allocate expenses, and generate reports to track performance.

By tracking expenses at a granular level, organizations can make informed decisions about resource allocation, identify areas of inefficiency, and make changes to improve overall performance, reducing costs and increasing efficiency.

ii) Profit center accounting

Profit center accounting is a process that allows organizations to track revenues and expenses at a granular level, providing insights into the profitability of individual business units, product lines, or geographic regions. By allocating revenues and expenses to specific profit centers, organizations can generate reports that help identify areas of high profitability or inefficiency.

SAP FICO provides a comprehensive profit center accounting module that enables organizations to create and manage profit centers, allocate revenues and expenses, and generate reports to analyze profitability. This information can be used to make informed decisions about product lines, investments, and resource allocation, enabling organizations to optimize their profitability and drive growth.

iii) Internal order accounting 

Internal order accounting is a process that allows organizations to track and control expenses associated with a specific project, event, or business process. By assigning costs to a specific internal order, organizations can monitor actual expenses versus budgeted expenses, and ensure that resources are allocated efficiently.

iv) WBS element accounting

WBS (Work Breakdown Structure) element accounting is a process that allows organizations to track and control expenses associated with a specific project or work breakdown structure. It involves breaking down large projects into smaller, manageable tasks or work packages, each of which is assigned a WBS element.

Expenses are then allocated to each WBS element to track actual versus planned expenses and ensure that resources are allocated efficiently.

Advantages of  Account Assignment 

The advantages of account assignment in SAP FICO include:

Better visibility: Account assignment allows organizations to track expenses and revenues at a granular level, providing better visibility into financial performance.

Resource allocation: By tracking expenses and revenues, organizations can make informed decisions about resource allocation, ensuring that resources are allocated efficiently.

Cost control: By identifying areas of inefficiency or waste, organizations can make changes to control costs and improve profitability.

Accurate reporting: Account assignment provides accurate reporting and analytics, enabling organizations to make informed decisions about their financial performance.

Compliance: Account assignment helps organizations comply with regulatory requirements and accounting standards.

How to Define Account Assignment?

Please follow the steps below to define the account assignment:

Execute t-code OKB9 in the SAP command field as shown in the image below.

OKb9

On Change View "Default account assignment": Overview you will see the list of default account assignments.

List

Next, click the  New Entries button to create a new account assignment.

New Enteries

In the next window, enter the following fields:

  • Cost Ctr 

Details

Now click on the Save button to save the new account assignment.

save

Now in order to post a test document to check that the account assignment works, execute t-code FB50 in the SAP command field.

Test

On the next popup enter Company Code as shown below.

Ccode

Now on the next window, click Tree On button.

Test

Next, select the Screen Variant in the next window and click Tree Off button.

Tree off

In the next window, enter the following fields according to your requirements:

Details

To make the document assignment, click the Post button.

Post

The account assignment is now defined and can be used for tracking expenses and revenues at a granular level in SAP FICO.

  • 04 Dec 2013 7:51 am rekha Account assignment is used in Sap Fico if you frequently use the same broad account assignments, such as a distribution of amounts to several company codes, accounts, or cost centers, you can use the account assignment model method to save input time and avoid input errors. The use of account assignment models is limited to G/L account items. T-code OK17 is used in the account assignment. If you have CO-FI real-time integration active you need this account assignment.
  • What is SAP FICO?
  • SAP FICO Training Tutorials for Beginners
  • SAP FICO Reverse Clearing Document
  • Foreign Currency Valuation Configuration
  • FICO Vendor Account Group Table
  • SAP FICO Withholding Tax
  • SAP FICO Cash Management Group
  • Assessment Cycle vs Profit Center
  • SAP FICO Posting Key for Bank
  • SAP FICO Document Type
  • SAP FICO Parked Workflow Configuration
  • SAP FICO Classic GL vs New GL
  • SAP FICO Accounts Receivable Configuration
  • SAP FICO Transaction Codes
  • SAP AS11 Create Asset Sub-Number
  • SAP Business Area and Profit Center
  • SAP Inconsistent Withholding Tax Info
  • SAP Active vs Passive Document Splitting
  • Reverse MIRO Document in SAP
  • SAP FICO Tree Menu
  • SAP FICO Define Account Group
  • SAP FICO User Exit for Vendor Master
  • SAP FICO Dunning Area
  • SAP FICO Asset Accounting
  • SAP FICO Document Number Ranges
  • SAP FICO GL Account for Cash Journal
  • SAP FICO Accounts Receivable Process Cycle
  • GR/IR Accounting Entries and Journal Entries
  • SAP FICO Chart of Accounts
  • SAP FICO Scope and Opportunity
  • FICO Certification Cost in India
  • SAP FICO Interview Questions

SAP Logo

3016084 - Only 2 Account Assignment categories available in Flexible Workflow - SAP S/4HANA & SAP Fiori.

When creating a new flexible workflow(for Purchase Order/Purchase Requisition) with account assignment category as a start condition, it is possible to choose from: Cost Center(K) or Project(P). Other account assignment cateogories are not available like "Q" or "X", for example.

Environment

  •  SAP FIORI 
  •  SAP FIORI for S/4HANA
  •  SAP S/4HANA All versions

fiori, MMFIOSTD,  WS00800173, BADI, manage workflow app, conditions, 1909, 1809 , KBA , MM-PUR-GF-WOF , Workflow , MM-FIO-PUR-REL , Fiori UI for Purchasing Approval , Problem

About this page

Search for additional results.

Visit SAP Support Portal's SAP Notes and KBA Search .

Privacy | Terms of use | Legal Disclosure | Copyright | Trademark

IMAGES

  1. What is Account Assignment Category in SAP MM, How to configure?

    account assignment sap

  2. Account Assignment Model In SAP Part 2

    account assignment sap

  3. Account Assignment Model in SAP: FKMT

    account assignment sap

  4. SAP Account Assignment Template FB50

    account assignment sap

  5. What is Account Assignment Category in SAP MM, How to configure?

    account assignment sap

  6. SAP Account Assignment Template FB50

    account assignment sap

VIDEO

  1. Creation of bank GL in SAP

  2. SAP Business One Initial Login

  3. How to Learn SAP

  4. Regular Live SAP MM classes: Automatic Account determination process Part 1

  5. SAP TRAINING |ACCOUNTS PAYABLE| SAP LIVE PROJECT |SAP TRAINING IN HINDI|

  6. SAP Business One: Login Troubleshoot

COMMENTS

  1. Account Assignment

    If you do not have an SAP ID, you can create one for free from the login page. ... Multiple account assignment allows you to apportion the cost of a material covered by a PO among your own cost center and several others, for example. You specify which account assignment object is to be charged via the account assignment category.

  2. What is Account Assignment Category in SAP MM, How to configure?

    Account Modification - IT indicates what GL account it will be posted through the Account Determination; acct.assgt (Derive Account Assignment) - If this is configured for an account assignment category, then the GL account and Cost Center will be pulled automatically by the system. (Pre-requisite: In Acct Modification whatever value is ...

  3. CO Account Assignment and Attribution with S/4HANA

    If a market segment is the real account assignment, there is the option to enter additional CO objects in the market segment pop-up. Like e.g., a WBS element and/ or an order. The account assignment type will be market segment (ACCASTY=EO) and in addition the order and the WBS element are attributed in the posting line.

  4. Working with Account Assignment

    Account assignment is used to find. the revenue accounts to which prices are posted. the sales deduction accounts to which surcharges and discounts are posted. In the standard version of the SAP System, all billing types are defined in such a way that the offsetting entry is made to the customer account.

  5. Account Assignment in SAP

    The term Account Assignment has different meanings depending on the context and Application. Here are the definitions by Application Component or Module. The accounting objects and/or accounts that are posted for a business transaction. The accounting object and/or the general ledger account to which items are posted in a document row.

  6. Account assignment in SAP Purchasing (MM)

    Solution: The indicator determines which account assignment screen is used by default for maintaining the account assign. for a purchase orde r item. For the EnjoySAP transactions, this value is simply a proposal that you can change in the purchasing document. For the old transactions, this value is the only one that you can use.

  7. Display SAP MM-FI Automatic Account Assignment

    You can easily display automatic account assignments as follows: View table T030, which stores OBYC configuration settings, with Transaction SE16N. Type in Table T030 and press Enter to display the selection screen shown in Figure 1. Figure 1: Table T030 Selection Screen To Display SAP MM-FI Configuration Settings.

  8. SAP Help Portal

    You can also assign equivalence numbers to account assignment models. In this case, you simply enter a total amount which is then distributed to the items within the model according to set ratios. Account assignment models can also be used across company codes can include company codes from non-SAP systems. Unless you enter a company code when ...

  9. SAP CO Account Assignment Tutorial

    This tutorial is part of our free SAP CO training. You will learn how account assignment works in SAP ERP and what are different sources of information about account assignment that the SAP system uses. Normally, when a financial document is entered in SAP FI module, user has the option of entering the cost center in the financial document.

  10. Defining Default Account Assignments

    Application Area. The default account assignment is a tool that automatically proposes specific cost assignment objects, such as cost centers or profit centers during journal entry. You can determine which management accounting object is defaulted for each line item based on the combination of primary cost and revenue G/L account and company ...

  11. Account Assignment

    Use. You can assign one or more account assignments to an item. Multiple account assignment allows you to apportion the costs covered by a purchase order partly to your own cost center and partly to others, for example. You specify which account assignment object is to be charged via the account assignment category.

  12. Account Assignment Object in SAP

    Account assignment objects can be objects such as cost centers, internal orders, projects, or business processes. Project System (PS) : The CO object to which postings can be made. In interest calculation, this is a CO object bearing costs and payments. Account assignment objects include WBS elements, network activities, and orders.

  13. Account Assignment Tables in SAP

    T163K. account assignment Categories in Purchasing Document. MM - Purchasing. Transparent Table. 30. TFKCOD. FI-CA: CO account assignment Key/Allocation. FI - Contract Accounts Receivable and Payable. Transparent Table.

  14. 2065095

    Go to the Implementation Projects view. Select the Project and select Open Activity List. Navigate to Fine-Tune and search for the activity Account Assignment Types. Open the activity and select Maintain Account Assignment Types. Select Add Row and in the drop-down for Primary Account Assignment you wish to add a new Primary Account Assignment.

  15. Explaining the Utilization of Different Account Assignment Object

    Account Assignment Objects. In the finance department, different entries may be required when entering documents. This depends, among other things, on the modules and functions that are required and set up for the specific company. For example, if profit center reporting is required, this information must also be available at document level so ...

  16. What is Account assignment in SAP FICO

    In SAP FICO, account assignment is a core module that offers various types of account assignment options, including cost center accounting, profit-center accounting, internal order accounting, and WBS element accounting. These options provide organizations with greater visibility into their financial performance, enabling them to optimize their ...

  17. Account Assignment Group in SAP

    Assignment. A value that defines the level of authorization or permission to access a resource or system. An assignment contains details regarding the requesting user, group, or object and the requested authorization, system, or permission. In an access control scenario, a user can request access to resources, systems, and role assignments ...

  18. ACCOUNT ASSIGNMENT

    "E"=> Sales order and G/L account number", the sales order item will be consider as with cost and revenue-carrying item. "M" =>Account assignment category is used for the sales order stock without cost object. Regards, Biju K. Edited by: Bijay Kumar Barik on Mar 12, 2008 11:29 AM

  19. account assignment

    CO Account Assignment and Attribution with S/4HANA Co-authored by Birgit Oettinger and Stefan Walz Welcome to this blog, in which we will provide insights into the new options of multiple CO account assignments and market segment attribution - innovations made possible with the Universal Journal...

  20. Account assignment mandatory for material

    Account assignment determination depend on the valuation class. When your account assinged category is mandatory in that case go and see the account modifier assigned in account assinged category. After that verify the G/L account in OBYC for key GBB and account modifier and respective valuation class assigned in material master.

  21. Account Assignment

    Account Assignment. In Sales order, under Account Assignment tab (Item Data) there is a field Order (AUFNR). For some Material number , Order number is present . But for some Material number we have to enter this Order number Manually using F4. Can you please explain how order number can automatically come in this field (AUFNR).

  22. SAP Help Portal

    SAP Help Portal - SAP Online Help

  23. 3016084

    3016084-Only 2 Account Assignment categories available in Flexible Workflow - SAP S/4HANA & SAP Fiori. Symptom When creating a new flexible workflow(for Purchase Order/Purchase Requisition) with account assignment category as a start condition, it is possible to choose from: Cost Center(K) or Project(P).